Skip to main content
Toggle navigation
Toggle search
Search
More purpose-built apps
Simplify awards management and manage complex abstract and proposal workflows with iMIS Application and Review, powered by OpenWater.
Engage members year-round with a seamless mobile experience that deepens connection and drives engagement with iMIS Mobile, powered by Clowder®.
Transform how you deliver certification, training, and education opportunities while enriching your learning programs and expanding revenue opportunities with iMIS Learning, powered by TopClass.
Maximize and track advertising revenue growth from sales through orders and invoicing with iMIS Advertising, powered by SpaceMaster.
iMIS
Search...
Toggle search
Search
Sign in
Toggle navigation
Scroll down
HOME
PIPE BURSTING HOME
MAB HOME
OVERVIEW
THE PIPING PROBLEM
A PIPING SOLUTION
PIPE BURSTING PROCESS
ADVANTAGES OF PIPE BURSTING
TOOLS/SYSTEMS
PIPE BURSTING & TRENCHLESS PIPE REPLACEMENT SYSTEMS
PNEUMATIC PIPE BURSTING SYSTEMS
STATIC BURSTING SYSTEMS
PIPE SPLITTING
PIPE REAMING
IMPACTOR PROCESS
DESIGN
DESIGN GUIDELINES
PRE-DESIGN PHASE
UTILITY SURVEY
INVESTIGATION OF EXISTING PIPE & SITE CONDITIONS
SOIL CONSIDERATIONS IN PIPE BURSTING
RISK ASSESSMENT PLAN
GROUND MOVEMENT ASSOCIATED WITH PIPE BURSTING
PLANS & SPECIFICATIONS
SUBMITTALS
DISPUTE RESOLUTION MECHANISMS
MAXIMUM ALLOWABLE TENSILE LOAD
PERMITTING ISSUES
TYPICAL BIDDING FORM FOR A PIPE BURSTING PROJECT
SELECTION OF PIPE SDR
CONSTRUCTION
CONSTRUCTION GUIDELINES
TYPICAL PIPE BURSTING OPERATION LAYOUT
SHORING THE INSERTION & PULLING SHAFTS
MATCHING SYSTEMS COMPONENTS TO REDUCE RISK OF FAILURE
TONING FOR UTILITIES
BYPASS PUMPING CONSIDERATIONS
DEWATERING CONSIDERATIONS
GROUND MOVEMENT MONITORING PROGRAM
PIPE CONNECTION TO THE MANHOLE
PIPE CONNECTION TO OTHER PIPES
PIPE BURSTING WATER MAINS
SCRATCH DEPTH
SCRATCH DEPTH
PIT SIZE/BEND RADIUS
PIT SIZE/BEND RADIUS
QA/QC
BID RANGE CHART
POTENTIAL PROBLEMS & THEIR POSSIBLE SOLUTIONS
QA/QC ISSUES
REFERENCES
REFERENCES
BID RANGE CHART
Bid Range Chart
The Bid Price Ranges for Upsizing Less than 20% and Upsizing Larger than 20%
Using Pipe Bursting Replacement of Different Diameter Pipes
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##
×